Case study

Hospitality capsule cluster — UK leisure site

  • United Kingdom
  • Resort operator
  • 6 capsule units for a leisure site

Background

A leisure site adding premium guest units ahead of the spring season.

The challenge

The units had to be assembled and ready before the booking season opened, with documents prepared for local sign-off.

What was supplied

Capsules ordered from a base model with a themed options list; the documents the project needed were prepared with the order and freight was timed backwards from the opening date.

Delivery scope

Supply to the UK handover point with clearance coordinated; local assembly, services and approvals arranged by the operator's team.

Outcome

Units assembled on site ahead of the season.

How it ran

  1. Options list Base model and interior selected per unit
  2. Documents Standards and supporting files prepared with the order
  3. Freight Sailings timed backwards from the opening date
  4. Assembly Local team assembles and finishes the units

Buildings in this project

Planning something similar? Send your project list and get one written quotation.

Request a quotation