01 / Product range
Two building systems, one quotation
Both ranges are bought as finished modules. Choose what each building is for, and the price list does the rest.
-
Space Capsules · A5x
A5x Space Capsule
- 29.7 m²
- 2 people
- Sectional — assembled and finished on site.
A 9-metre capsule …
-
Container Cabins · CC-D1
Container Cabin — Site Accommodation Module
- 14.8 m²
- 4 people
- Whole modules or flat-packed — confirmed per route.
Dormitory modules …
-
Container Cabins · CC-K1
Container Cabin — Kitchen & Dining Module
- 29.7 m²
- 30 people
- Whole modules or flat-packed — confirmed per route.
Cooking, storage a…
-
Container Cabins · CC-O1
Container Cabin — Office & Meeting Module
- 14.8 m²
- 12 people
- Whole modules or flat-packed — confirmed per route.
Desk rows and a me…
-
Container Cabins · CC-S1
Container Cabin — Sanitary Module
- 14.8 m²
- 20 people
- Whole modules or flat-packed — confirmed per route.
Toilet, shower and…
-
Space Capsules · E8x
E8x Space Capsule
- 38.5 m²
- 4 people
- Sectional — assembled and finished on site.
The larger capsule…
02 / Where they go
Built for camps, resorts and private land
The same module is configured differently depending on what it has to do and where it has to stand.
-
Hospitality and glamping
Guest units for resort…
-
Kitchen and dining
Kitchen and dining mod…
-
Office and meeting
Site offices and meeti…
-
Sanitary
Washroom and sanitary …
-
Site accommodation
Dormitory and welfare …
03 / Why Modarven
The parts of the order that usually go wrong
A written quotation, a factory inspection before the container leaves, and one person answering for the whole order.
-
01
Four answers before any price
Use and quantities, destination and delivery point, target date, and the certification the project needs. The quotation is built from those, so it does not move afterwards.
-
02
Quoted from a standard price list
Dormitory, kitchen, mess hall, office and sanitary modules each carry their own price, with options listed separately. A full camp list comes back as one written quotation.
-
03
Inspected before it ships
Photographs, video and the packing list are kept, and the container is filmed as it is loaded — so a shortage or a damaged panel is settled from a record rather than from memory.
-
04
One contact through to delivery
You hold one contract and talk to one person, from the first layout drawing through production, inspection, loading and the arrival check.
04 / How an order runs
From a camp list to a loaded container
Six steps. Site preparation, foundations, unloading and local assembly stay with your team — we say so up front rather than in the small print.
-
01
Brief
Send the list: how many of each module, what goes inside, the destination and the date the site needs them.
-
02
Quotation
A written quotation, itemised by module and option, with what is included, what is excluded and what is still to confirm.
-
03
Drawings
Factory drawings confirm the layout and the fittings. Production starts only once you have approved them in writing.
-
04
Production
Built to the approved version. Anything that changes is priced and dated before it is built, not after.
-
05
Inspection
You inspect at the factory, send someone, or appoint a third party. Photographs, video and the packing list are filed either way.
-
06
Shipping
Loaded and filmed, then shipped. Loading, forwarding and customs at destination are arranged per order and written into the quotation.
05 / Where we ship
Buyers in the Gulf and northern Europe
Price, paperwork and delivery terms are quoted per destination, because customs and site conditions differ from one country to the next.
-
Other markets
Enquiries outside the …
-
Saudi Arabia & Middle East
Construction contracto…
-
United Kingdom & Europe
Hotel and resort opera…